As part of determining the feasibility of remodeling the station to meet future needs versus constructing a new station, North Tahoe Fire Protection District retained Linchpin Senior Principal Doug Gadow to perform a seismic evaluation of the existing building. Mr. Gadow developed a list of issues and recommended mitigation measures for the District’s use.
Forbes-Linchpin Structural Engineering, Inc. | Seismic Evaluation Engineering
Mr Gadow, was Engineer of Record for this project at his previous employer, Gary Davis Group.