Truckee Donner Public Utility District | Public Structures Engineering

Linchpin engineered and prepared full Construction Documents for the local Public Utility District for this offsite facility. The structure was designed to remain fully operational under any anticipated loading, including extreme wind and snow events and maximum considered earthquakes. The structure includes reinforced masonry walls, steel frames and a trussed roof.

Slide Truckee Donner Public Utility District-1 Slide Truckee Donner Public Utility District-2 Slide Truckee Donner Public Utility District-3

Forbes-Linchpin Structural Engineering, Inc. | Public Structures Engineering